Government of Saskatchewan
Wednesday, March 20, 2019
Publications Centre
Publications Centre
MY Account | View Cart





Product List
 2 | A | C | D | E | I | N | P | R | S | T | W |

2
  2016 Oil and Gas Reserves: Active Pool Update
August 1, 2017:Oil and gas summary reports for 2016 are now available. See the IRIS Industry Tip for more information.
Up Back To Top
A
  Attachment Types and File Sizes Accepted by IRIS
See the IRIS Industry Tip to see what attachment types and file sizes IRIS accepts. Current as of February 14, 2017
Up Back To Top
C
  Change to Lease Continuance Preliminary Notice Schedule
May 25, 2017: The Ministry of the Economy is discontinuing the generation of preliminary lease continuance reports in IRIS for the months of April through September. Read the IRIS Industry Tip for more information.
Up Back To Top
D
  Directive PNG025 Licensee Liability Rating (LLR) Program
Directive PNG025 - Licensee Liability Rating (LLR) Program (Formerly Guideline PNG025 Licensee Liability Rating Program).
Up Back To Top
E
  Error When Opening and Viewing Incidents
September 22, 2017: An application error may occur when a user attempts to open or view incidents in IRIS. See the IRIS Industry Tip for more information.
  Extension: Shadow-Billing Period for IRIS Non-Compliance Penalty Assessment Program Continues Until Early-2018
October 24,2017: The Government of Saskatchewan is extending the shadow-billing period for the non-compliance penalty assessment program for unfulfilled oil and gas well data submission obligations in IRIS until early 2018. Read the Tip for more information.
Up Back To Top
I
  Incorrect Warning Message for Target Pool and Drainage Unit/Area in Well Licence Application
May 26, 2017: IRIS is providing incorrect warning messages to well licence applicants when the user selects a target pool and drainage unit/area. See the Tip for more information.
  IRIS Infrastructure Notifications Email Alerts Unavailable
February 28, 2017:Users that subscribed to receive an email alert when new well and facility infrastructure notifications are available in IRIS are encouraged to review their notifications mailbox in the system. See the IRIS Industry Tip for more information.
  IRIS Notifications Enhancements
January 17, 2017: IRIS Notifications Enhancements in the 5.6 Release
  IRIS Self-serve Password Reset Functionality
February 1, 2017: Did you know that IRIS has self-serve password reset functionality? See the IRIS Industry Tip for more information.
Up Back To Top
N
  New IRIS Functionality for Unit Applications
June 8, 2017: The way the oil and gas industry applies for units or to amend units in IRIS has changed. See the Industry Tip for more information.
  New Oil Analysis Requirements for Well Completions
August 10, 2017: A new disclosure question was added to IRIS's well licence application to reflect changes to oil analysis requirements for new wells as outlined in Version 2.1 of Directive PNG017: Measurement Requirements for Oil and Gas Operations. See the IRIS Industry Tip for more information.
  No surface Disturbance/Cancelled Wells on IRIS
October 3rd,2017 No Surface Disturbance/Cancelled Wells on Iris
  Non-Compliance Shadow Billing Extended
January 13, 2017: Non-Compliance shadow billing extended to June 30, 2017
  Notice of Pending Cancellation for Dispositions Issued
February 2, 2017: ECON issued pending cancellation notices to lessees and/or Confidential Designated Representatives of Crown dispositions. See the IRIS Industry Tip for more information.
  Notice to All Operators: Second Wave Petroleum Inc. Licences are Available for Transfer
2017-09-25: Notice to All Operators: Second Wave Petroleum Inc. Licences are Available for Transfer
Up Back To Top
P
  PAD Well Set Coming to Well Licence Applications
September 19, 2017: PAD well information will be captured through IRIS's well licence application starting on October 4, 2017. See the Tip for more information.
Up Back To Top
R
  Resource Surcharge WIO Detail Report on IRIS
October 4, 2017: The Ministry of the Economy has introduced the ability for Business Associates (BA) to run BA Resource Surcharge Working Interest Owner (WIO) Detail Reports in IRIS. See the IRIS Industry Tip for more details.
Up Back To Top
S
  Shadow Billing Ends June 30 for IRIS Non-Compliance Penalty Assessment Program
May 16, 2017: The shadow billing period for the Ministry of the Economy's non-compliance penalty assessment program for unfulfilled well data submissions in IRIS ends on June 30, 2017.
Up Back To Top
T
  Tenure Acquisition Reports Unavailable
August 9, 2017: Tenure acquisition reports are currently unavailable in IRIS. See the IRIS Industry Tip for workarounds until a permanent fix can be implemented.
Up Back To Top
W
  Well Document Search Function on December 6, 2017:
November 20,2017: ‘Well Document Search’ Function on December 6, 2017
  Workaround:Reporting Initial Completion Data (Fluid Analysis Requirement Issue)
August 2, 2017: IRIS is currently experiencing an issue that is impacting industry’s ability to submit immediate reporting of well completions to the Ministry of the Economy. A temporary workaround is to be used until the issue can be fully resolved. See the IRIS Industry Tip for more information.
  Wrong Reference Number on IRIS Inspection Item Reminders
June 26, 2017: IRIS is generating inspection reminder notifications with the wrong reference ID. See the Tip for more information and industry action.
Up Back To Top